A Case Study of a Jilin Client's Procurement of a Thousand-Ton Gantry Shear

Breaking with Tradition, Creating the Future: A Case Study of a Jilin Client's Procurement of a Thousand-Ton Gantry Shear

 

I. Project Background: The Transformation Challenges of Scrap Metal Processing

Jilin Province, as an important old industrial base in my country, has a developed metal processing and manufacturing industry, generating a large amount of scrap metal materials annually. Our Jilin client, Jilin Xinlong Metal Recycling Co., Ltd., is a professional enterprise engaged in the recycling, processing, and sales of scrap metal. With the expansion of its business, traditional manual cutting and small-to-medium-sized equipment could no longer meet its growing processing needs.

The client faced three core pain points:

1. Low processing efficiency: Thousands of tons of scrap metal were piling up every month.

2. High labor costs: Traditional cutting methods required a large workforce.

3. Safety risks: Manual operation of large metal cutting posed safety hazards.

 

II. Needs Analysis: A Tailor-Made Solution

In early 2023, after in-depth research, Xinlong Metal's management decided to purchase a large gantry shear. Their specific requirements include:

Core Requirements:

-Processing Capacity: 1000-ton shearing force, capable of handling metals of various thicknesses

-Equipment Stability: Adaptable to temperature variations in Northeast China, operating year-round without interruption

-Automation Level: Reduced reliance on skilled workers

-Safety Performance: Compliant with the latest safety production standards

Special Considerations:

-Footprint: Limited factory space necessitates a rational layout

-Energy Consumption Control: Electricity cost control is a key factor

-Post-Maintenance: Localized technical service support system

 

产品照片-(4).jpg产品照片-(5).jpg


III. Solution Design: A Breakthrough in Intelligent Manufacturing of a 1000-ton Gantry Shear

After conducting in-depth on-site investigations, our technical team provided a customized solution:

Equipment Configuration Highlights:

1. Core Parameters

-Shearing Force: 1000 tons

-Blade Length: 1200mm

-Maximum Material Holding Force: 150 tons

-System Pressure: 28MPa

-Main Unit Power: 55kW

2. Technological Innovation

-Employs a German Siemens PLC control system for one-button operation.

-Equipped with a hydraulic overload protection device to prevent equipment damage.

-Unique quick-change blade design reduces downtime.

-Infrared safety protection system provides comprehensive safety assurance.

3. Localized Adaptation

-Enhanced hydraulic oil heating system adapts to the cold climate of Northeast China.

-Anti-freeze piping design ensures normal operation in winter.

-Reserved interface for smart factory, supporting future digital upgrades.

Plant Layout Optimization: Our engineers assist customers in replanning production areas and designing material flow routes, enabling seamless integration of new equipment with existing production lines and improving overall operational efficiency by over 30%.

 

IV. Project Implementation: Professional and Efficient Delivery Experience

Implementation Highlights:

1.Precise Delivery: Equipment production completed 15 days ahead of schedule, with full GPS monitoring throughout transportation.

2.Rapid Installation: A professional installation team completed all installation work within 10 days.

3.Comprehensive Training: 12 operators and 4 maintenance personnel trained for Xinlong Metal.

4.Local Service: A permanent service point established in Changchun, responding to service requests within 2 hours.

-Customer Feedback:

"This gantry shear has completely changed our production model. Previously, mountains of scrap steel can now be processed in a week, and safety has been greatly improved. Most importantly, the return on investment far exceeded expectations; we expect to recover all costs in 18 months." — Production Director, Xinlong Metal Wang Jianjun

Social Benefits:

-Increased annual scrap metal processing capacity from 30,000 tons to 100,000 tons

-Reduced metal resource waste and promoted circular economy development

-Created new jobs and drove regional industrial upgrading

 

VI. Value Extension: More Than Just a Piece of Equipment

Through this cooperation, Xinlong Metal not only acquired a high-performance piece of equipment but also embarked on a path of intelligent transformation:

1.Management Upgrade: Real-time production data collection enables refined management

2.Process Optimization: Drives collaborative improvement across upstream and downstream processes

3.Market Expansion: Increased processing capacity enables it to undertake larger-scale recycling business

4.Brand Upgrading: Becoming a benchmark enterprise in the Northeast China scrap metal processing industry

 

VII. Looking to the Future: A New Chapter of Continuous Cooperation

Based on the success of our initial cooperation, Xinlong Metal has signed a long-term strategic cooperation agreement with our company:

1.Equipment Upgrade Plan: An automatic feeding system will be added in 2024.

2.Phase II Project: A new 800-ton gantry shear is planned, enabling dual-machine collaborative operation.

3.Digital Factory: Collaborative development of a production management system to achieve full-process digitalization.

Conclusion: The Jilin Xinlong Metal 1000-ton gantry shear project is not only a successful equipment procurement case but also a microcosm of the intelligent upgrading of traditional manufacturing. We believe that excellent production equipment coupled with professional service support can create value exceeding expectations for every enterprise.