Search for more information
100 tons pre-shipment customer test run site
Release Time:2026-06-15

Buying a metal baler from China can be a cost-effective solution for businesses looking to streamline scrap metal processing, but it’s crucial to consider after-sales support. Without proper post-purchase service, even the most affordable machine can become a costly liability. 

Here’s what reliable after-sales support should look like when purchasing a metal baler from China:

1. Clear Communication Channels

- Multilingual Support: The supplier should offer customer service in your language (e.g., English, Spanish, German) to avoid misunderstandings.Responsive Team: Quick response times (within 24 hours) via email, phone, or live chat are essential—especially during installation or emergencies.Dedicated Account Manager: A single point of contact helps maintain consistency and accountability throughout the process.

2. Comprehensive Installation & Training

- On-Site Installation Assistance: Reputable suppliers provide engineers or technicians who can visit your facility to oversee setup and ensure correct installation.Remote Guidance: If on-site help isn’t feasible, detailed video tutorials, step-by-step manuals, and real-time remote support (via Zoom or similar tools) should be available.Operator Training: Hands-on training for your staff is critical. This includes safety procedures, daily maintenance routines, troubleshooting basics, and operation best practices.


 1781509974479632.jpg


Core On-site Test Parameters & Operation Details

Different from conventional no-load debugging, this test adopted full-load simulation working conditions consistent with the customer’s actual production scenarios. The test team continuously operated the 100-ton equipment for 4 consecutive hours under rated load. Key monitored indicators all met contractual standards: the main spindle operating stability error was controlled within ±0.02mm, hydraulic system pressure fluctuation did not exceed 3%, and the automatic feeding and discharging linkage response lag was less than 0.5 seconds. During the operation, infrared temperature detection showed the core bearing surface temperature stabilized at 52℃, far below the safety threshold of 75℃, with no oil leakage, abnormal vibration or noise in all connecting structures.


IMG_20251024_150802.jpg

apple-valley-recycling-center-0001-bailed-recycle-2-548554fb271f.jpg


Customer On-site Verification & Problem Optimization

Customer technicians conducted targeted spot checks focusing on two personalized modification requirements proposed in the contract. First, they verified the upgraded anti-corrosion coating on the load-bearing chassis adapted to coastal high-humidity working environments; second, they tested the bilingual human-machine operation interface tailored for local operators. One minor optimization item was confirmed on site: the stroke prompt icon on the control panel was adjusted for clearer visual recognition. Our after-sales engineers finished the modification within 90 minutes and passed secondary recheck immediately.


Banner 下午8.21.11 下午8.21.11 下午8.21.11 下午8.21.11.jpg

unnamed (1).jpg


Subsequent Delivery Arrangement

After signing the pre-shipment test acceptance report by both parties, the equipment will enter unified protective packaging procedures, including waterproof vacuum wrapping for electrical cabinets, shockproof wooden reinforcement for precision components and rust-proof oil spraying for exposed metal parts. Container loading and customs declaration will be arranged within 3 working days, and the whole logistics cycle is estimated to be 28 days. We will provide synchronous remote technical guidance for on-site unpacking and secondary debugging after the equipment arrives at the customer’s port.

Leave Your Message